SAP Malaysia
Level 29 Southpoint Tower, Mid Valley
Duration: 12 weeks
Size: 15,909 sqft
The tech company wanted a space that represents them today & in the future.
A biophilic and sustainable approach governed the design development. Sinuous forms are simplified within the office space, bringing Malaysia’s tropical & natural biodiverse habitat into the design elements. Placing intended nature next to technological.
Making sure each element complimented the other while maintaining sustainable construction methodology was the end-to-end driving direction.